Showing posts with label gwent levels. Show all posts
Showing posts with label gwent levels. Show all posts

Thursday, 18 September 2008

Protest against Proposed Motorway through the Gwent Levels

Protest against the proposed motorway through the Gwent levels.
No New M4! - The Big CALM Protest
Tuesday 23rd September at 12 Noon
Steps of the Senedd, Cardiff Bay


The day after the Assembly re-opens after the summer break; CALM will be holding a protest on the steps of the Senedd.

This is our chance to tell the government that enough is enough, and that these damaging plans need to be axed, now.

This is your chance to tell your elected representatives that you don't want your money spent on destroying our natural heritage and the atmosphere. Join us in opposing this environmentally devastating scheme! Please pledge to attend our protest event.

For those who do not know about CALM, it stands for Campaign Against the Levels Motorway which will cut through 5 miles of the Gwent Levels SSSI, in reens, destroying grazing marsh, affecting the habitat of species like otter, water vole and barn owl (and being certain to cause road deaths of far too many otters and barn owls too), turning three chunks of the Gwent Levels into pathetic isolated 'islands' cut-off from the remainder of the Caldicot and Wentlooge Levels, with pollution from the scheme set to spread through the reen system to damage the freshwater life of the whole wetland system.

www.savethelevels.org.uk

Tuesday, 22 July 2008

Campaign Against the Level Motorways (CALM)


Green activists in the LEFT Alternative asked us to flag up this campaign and invite people to support it. Our group hopes to support all local campaigns that put people and planet before profit. If you are involved in any activism or have any news stories why not email us!

Campaign Against the Levels Motorway is an alliance of individuals and organisations who oppose the construction of the M4 relief motorway through the Gwent Levels Site of Special Scientific Interest.

To relieve congestion on the M4 around Newport the Welsh Assembly Government wants to build 24km of dual three-lane motorway around the south of the city. The road would link junction 23A at Magor with junction 29 at Castleton with two new junctions being proposed for Newport.

In 1999, consultants acting for the Assembly Government concluded that steps to reduce the demands for car journeys plus improved public transport could be a successful alternative to major roadbuilding. They also added that construction of the M4 Relief Road would cause huge environmental damage to nationally important sites and would encourage more car trips.

If approved, the new road would:

* cost hundreds of millions of pounds
* be Wales' first toll motorway increase traffic levels and pollution in South Wales
* devastate important wildlife sites
* shatter the tranquillity of the Levels
* fuel dangerous climate change